Pipeline

Six-step test pipeline. File names are workspace paths, not links on this site.

1 DONE

1. DONE — two-solid STEP (print 0.55 / finish 0.40) + analytic disk on 0.0148. Files: cad/rig/cooky_t1_foil_rig.step, fea/DISK.md

2 OPEN

2. OPEN — Cold balance G2.5 (0.044 g·mm two-plane at 80k residual). Catcher-only spin under 20k on foil, 51101 20–40 N, eddy at J2. Card: SPIN.md. CAD exists, not a run.

3 OPEN

3. OPEN — TC-RIM / TC-ID. Traveler INSTRUMENT.md (Type N TC-ID A/B + TC-RIM). 0.20 still not trip-safe. Cold 20k does not wait on this. Not instrumented.

4 OPEN

4. OPEN — 282 coupon for AM Sy. COUPON.md is a traveler only. No green until a Z-build 650 C Sy cert.

5 PARKED

5. PARKED — Sleeved AMB (pole ~22, 0.15 gap, ≳5e7) after the 20k run exists. No AMB geometry on this article.

6 LAST

6. LAST — CFD: SU2 + CoolProp, nozzle + rotor, ECM wall. Not air. SU2 is not installed.